Tuesday, 5 January 2016

Production Schedule #1

Jan 9 (12 to 1 O'clock)
Zombie opening scene practice shoots.
Jan 10 (12 to 4 O'clock)
Practice shoots every shot with main actor try costume.
Jan 16 (12 to 1 O'clock)
Final Opening scene as well as other scenes where main character doesn’t need to be in.
Jan 17 (12 to 4 O'clock)
Film the hardest shots with main actor (shoots with car)
Jan 23-24 (12 to 2 O'clock)
Shoot any thing missing or that needs to be re shot

No comments:

Post a Comment

All comments will be moderated before being posted.